Implementation of the construction of the linkage between the flock-Daralmizan and the Azulyeh-Firoozabad highway (Parts 2 and 3)
Supervision of the operation of the construction of the linkage between the herd-Daralmizan and the Azulyeh-Firoozabad highway (parts 2 and 3) to the Employer of the Larestan Road and Urban Planning Office, under Contract No. 14586 / A / 29, dated 28/11/1389, to these consulting engineers Has been communicated.
The target axis is located between km + 000 and +100 + 36 with a width of 11 meters. The mosque has mostly crossed the plains and hills.
The total length of the route is about 36 km, and the final standard of the axis is a first-class main road with a total length of 11 m, comprising two lanes each with a width of 3.65, a shoulder of 1.85 m on both sides.
Professional and social life of human is formed and built based on ration, including personal and plural wisdom, and at the time of failure and success the attitude that comes from ration leads to critical and determinative decisions. Today with the conditions that there is no economical justification to run consulting engineers companies, the belief of managers is on that rich environmental, human and financial resources of Iran shows a perspective of incredible potential and rapid development needs in the future if it comes with right and competent management. By this inherent belief, how consulting engineers could pass by this national, social and professional responsibility apathetically and ignore creative complexes which brighten the future of this beloved country? This consulting engineers company has a look at that future with the support of young educated human forces and cooperation of academic centers.