wordpress slider by WOWSlider.com v7.7

Railway




_____________________________________________________________________________


Basic design studies of the first part of the Bam-Jiroft railway axis

The purpose of this project is to connect the city of Jiroft to the rail network of the country in such a way that the future development direction towards Bandar Abbas in order to establish a rail link between Bafgh-Bam axis and Bafg-Bandar Abbas also The title of a parameter should be considered.

In the initial justification studies (by the consultant of the bridge), three corridors were introduced, all three corridors being separated from the existing Kerman-Bam railway.




______________________________________________________________________________________________________________________________________


                       
Carrying out technical and economical justification of passive and environmental defenses related to the connection of the electric train in the new city of Golbahar to the city of Chenaran and the construction of the road between the road   1
Carrying out technical and economical justification of passive and environmental defenses related to the connection of the electric train in the new city of Golbahar to the city of Chenaran and the construction of the road between the road   2
Monitoring the operation of the part of a Darab connection to the country's rail network   3
Exploration studies of Ilam-Khorramabad railway projects, Jahrom-Lar connection to Tehran-Qom high-speed network and railways   4
Design studies on the base of the Darab railway axis to the grid   5
Basic design studies of the first part of the Bam-Jiroft railway axis   6